Published: 1995-11-19

RCM: The Bruce B Experience

Earl S. Hill, E. Kevin Doyle

13-18

Non-lntrusive Downcomer Flow Measurements: A Means of Monitoring Steam Generator Performance

C.E. Taylor, J.E. McGregor, C.A. Kittmer, M.J. Pettigrew, E.F. Jelinski, D.A. Seppala

33-46

Darlington Steam Generator Life Assurance Program

Eric Jelinski, Mike Dymarski, Carmina Maruska, Eric Cartar

47-52

Darlington NGD Liquid Injection Shutdown System (LISS) Valve Performance

Murray Wightman, Frank Amantea, Brian Speer, Amir Rouhi

93-94

Water Lancing of Bruce-A Unit 3 and 4 Steam Generators

Frank V. Puzzuoli, Brent Murchie, Steve Allen

189-212

Steam Generator Waterlancing at DNGS

Dave Seppala, Eric Kiisel, Frank Kamler, Jim Malaugh

213-226

Pickering Unit 1 Chemical Cleaning

J.L. Smee, R.J. Fiola, K.R. Brennenstuhl, D.D. Zerkee, C.M. Daniel

229-242

Ultrasonic Inspection of Electrosleeved Steam Generator Tubing

D.P. Jansen, M.D.C. Moles, W.K. Chan, E.I. Choi, H.D. Mair

325-326

Upgrading Primary Heat Transport Pump Seals

T. Graham, R. Metcalfe, D. Rhodes, D. McInnes

335-340

The Development of a Station Maintenance Strategy

F. Fitzsimmons, R. Bearton, T. Andreeff

346

Current Experience in Supporting Commercial Nuclear Power Plant Maintenance

J.M. Jenco, K.F. Barry, W.E. Johnson, J.P. Sharkey, R.l. Wolfgang

443-448

Research on Nondestructive Examination Methods for Candu Fuel Channel Inspection

M. Soare, F. Petriu, V. Toma, V. Revenco, A. Calinescu, R. Ciocan, C. lordache, L. Popescu, M. Mihalache, C. Murgescu

449-464