The TRIUMF Cyclotron Remote Servicing System
Main Article Content
Abstract
The TRIUMF facility has been operational since 1974. During that period the Remote Handling Group has built and operated a system of Dedicated Trollies to service cyclotron components. Five special purpose, and four manipulative trollies, operated by "Direct Manual Control", are presently being upgraded for programmable controller operation (1).
Article Details
Section
Articles