Environmental Assessment For OPG's Deep Geologic Repository For Low And Intermediate Level Waste
Main Article Content
Abstract
The environmental assessment process for the Deep Geologic Repository (DGR) Project was initiated very early in the planning stages. Feasibility studies were initiated in 2003, after Ontario Power Generation (OPG) and the Municipality of Kincardine signed a Memorandum of Understanding agreeing to assess options for long-term management of low and intermediate level waste (L&ILW) options at the Bruce nuclear site. The location of the DGR, in the Municipality of Kincardine, is based on a willing and informed host community. The preferred approach, the DGR at the Bruce nuclear site, was advanced based on results of feasibility studies which looked at a number of options for long-term management of L&ILW and support from the local community and their elected representatives.
The federal environmental assessment of the project was initiated following the signing of a Host Community Agreement and completion of a telephone poll, the results of which indicated that the majority of Municipality of Kincardine residents support the project. The environmental assessment began in 2006 as a comprehensive study and was ultimately referred to a joint review panel process in 2009.
The environmental assessment considers the potential near-term effects of the construction and operations of the proposed project. Because of the nature of the project, the assessment of effects also considers long-term effects extending out to the million year time-frame, including effects of climate change, glaciations and seismic activity.