OPG's Long Term Management Proposal For Low And Intermediate Level Radioactive Waste: Project Description, Operations

Main Article Content

Pauline Witzke

Abstract

Although the Deep Geologic Repository (DGR) is approximately 8 years away from being placed into service, it is time to start planning for operations. Ontario Power Generation's (OPG) Nuclear Waste Management Division (NWMD) has a systematic approach to preparing for operation of any new facility that is readily applicable to the DGR. The DGR Operational Readiness Plan has been benchmarked at similar facilities in North America and Europe. The operating vision is a living model, and is constantly being reviewed and refined to align with the detailed design of the DGR as it proceeds through its phases of development.

Combined with 40 years of operating surface storage facilities for the storage of Low and Intermediate Level Waste (LILW), the DGR operating vision will enable NWMD to provide meaningful input during COMS (Constructability, Operability, Maintainability, and Safety) review in the DGR project detailed-design phase in 2011/2012. A Work Breakdown Structure has been used to communicate the detail of the operating vision, and also to estimate the costs of Operational Readiness and Operations during the lifetime of the facility.

Article Details

Section
Articles