An Investigation of the Suitability of the Chalk River Site to Host a Geologic Waste Management Facility for CRL's Low and Intermediate Level Wastes
Main Article Content
Abstract
Atomic Energy of Canada Limited (AECL) is investigating the suitability of the Chalk River Laboratories (CRL) site for hosting a Geologic Waste Management Facility (GWMF) as part of the Nuclear Legacy Liabilities Program (NLLP) funded through Natural Resources Canada (NRCan). The GWMF is envisioned to be an underground engineered-geological repository consisting of shafts, access tunnels and emplacement caverns located at a nominal depth of 500 to 1000 m in the bedrock at the CRL site.
A 5-year-long pre-project study was started in 2006 to assess the feasibility of the bedrock at the CRL site to host a GWMF. The pre-project feasibility study began with a review of various previous geological investigations performed in the bedrock at the CRL site.
The 2006-2010 pre-project feasibility study involved exploring the geoscience and engineering characteristics of the bedrock to depths of over one kilometre at the CRL site through surface investigations and the drilling and testing of seven new deep characterization boreholes into the CRL bedrock. The collected information and interpretations were used to construct threedimensional (3D) deterministic computer models of the geology of the bedrock at the CRL site and surrounding area and of the associated groundwater-flow regime.
In order to technically assess the suitability of the CRL site, the GWMF feasibility study has conservatively assumed that all of the legacy and forecast Low and Intermediate Level Waste (LILW) at CRL would report to it. The 3D deterministic models were used within a preliminary performance and safety assessment model to assess the long-term safety of a hypothetical GWMF at the CRL site on the basis of future radionuclide and toxic substance releases. Other items important to a preliminary performance and safety assessment include an inventory of CRL's radioactive wastes and other contaminants that could be placed in the GWMF, the creation of the engineered waste emplacement rooms and barriers within the GWMF.
This paper describes the technical work undertaken and the general findings of the preliminary performance and safety assessment study.