Abstract
Shutdown System 1 (SDS1) is a preferred method for a quick shutdown of nuclear fission process in CANDU (CANada Deuterium Uranium) reactor units. Failure of a routine SDS1 safety test during Fall 2009 outage resulted in the need to develop and execute a new methodology for Shutoff Rod inspection and re-evaluate the known degradation mechanisms and failure modes. This paper describes the deverlopment of this methodology and the obtained results. It also proposes several alternative solutions for the future performance analysis and maintenance/inspection optimization for SDS1 Shutoff Rods based on the Bruce Power Unit-3 Shutoff Rod 5 case study.