GRA Model Development at Bruce Power
Main Article Content
Abstract
In 2007, Bruce Power undertook a project, in partnership with AMEC NSS Limited, to develop a Generation Risk Assessment (GRA) model for its Bruce B Nuclear Generating Station. The model is intended to be used as a decision-making tool in support of plant operations. Bruce Power has recognized the strategic importance of GRA in the plant decision-making process and is currently implementing a pilot GRA application. The objective of this paper is to present the scope of the GRA model development project, methodology employed, and the results and path forward for the model implementation at Bruce Power.The required work was split into three phases. Phase 1 involved development of GRA models for the twelve systems most important to electricity production. Ten systems were added to the model during each of the next two phases. The GRA model development process consists of developing system Failure Modes and Effects Analyses (FMEA) to identify the components critical to the plant reliability and determine their impact on electricity production. The FMEAs were then used to develop the logic for system fault tree (FT) GRA models. The models were solved and post-processed to provide model outputs to the plant staff in a user-friendly format. The outputs consisted of the ranking of components based on their production impact expressed in terms of lost megawatt hours (LMWH). Another key model output was the estimation of the predicted Forced Loss Rate (FLR).
Article Details
Section
Articles