It is desirable to reduce the duration of defuelling the reactor in preparation for retube, as the cost of replacement power is $750K/day. Three fast defuelling concepts are presented. With the Through Flow Defuelling method, the fuel string is hydraulically pushed into the downstream Fuelling Machine (FM) by flow passing through the fuel channel. The Long Stroke C Ram method replaces the FM C Ram with a longer one capable of pushing all fuel bundles into the receiving FM. Defuelling Hardware uses enhanced design of ram extensions that interconnect mechanically to extend the Ram stroke to push fuel bundles into the receiving FM. This paper will present descriptions of each defuelling concept to prepare for Large Scale Fuel Channel Replacement. Advantages and disadvantages of each concept will be discussed and a recommendation will be made for future implementation.