Refinements to Calandria Tube - Liquid Injection Nozzle (CT-LIN) Contact Assessments
Main Article Content
Abstract
In recent years, the issue of CT-LIN contact, which first gained attention in 1989, has been addressed through CT-LIN gap measurements, followed by analytical predictions of time-to-contact. CT-LIN time-to-contact predictions have been preformed independently by CPUS Limited for Point Lepreau and Gentilly-2 and by AECL Sheridan Park (now Candu Energy Inc.) for Bruce Power and Gentilly-2. Both companies used the CDEPTH code in combination with CT-LIN gap measurements. Subsequent to the assessments for Point Lepreau and Gentilly-2, a recommended approach for future assessments was presented at the 2008 CANDU maintenance conference. Since that time, a number of refinements to the overall strategy for predicting CT-LIN time-to-contact have been developed and are outlined in this paper. The refinements include: 1. The use of ultrasonic LIN elevation measurements to confirm LIN creep sag behaviour; 2. The development of a non-linear empirical CT Creep Sag Model; 3. The development of a rationale for discrepancies observed in repeated optical CT-LIN. gap measurements and a discussion of alternative CT-LIN gap measurements With these refinements, more accurate CT-LIN time-to-contact predictions can be obtained. For stations that plan to refurbish by 210,000 EFPH, the improvement in time-to-contact predictions resulting from the fore mentioned refinements will not be of any real benefit. However, for stations that are planning life extensions in order to operate beyond 210,000 EFPH, CT-LIN contact will be an issue. For these stations, improvements in CT-LIN contact time predictions would be beneficial. This paper presents a summary of the proposed refinements and demonstrates how they would impact CT-LIN time-to-contact predictions.
Article Details
Section
Articles