An Innovative Strategy for Secondary Side System Lay-Up Using Film-Forming Amines
Main Article Content
Abstract
The major safety function of steam generators (SG) in pressurized reactors is well known as acting as a barrier between the radioactive primary side and the non-radioactive secondary side. The main reason for SG tube failure is known to be the accumulation of deposits contributing to formation of local aggressive conditions. Consequently the SG has to be kept as clean as possible and the corrosion product transport into the SG has to be minimized. In order to reach this target, plant operators are making worldwide huge efforts to protect plant systems against corrosion during standstill and outages. Especially in case of large component replacements campaigns like steam generator or fuel channel replacements which are linked to prolonged outages lay-up strategies become important. The use of surface active agents like film-forming amines (FFA) has become very popular in the fossil power plant sector, showing a decrease of corrosion product generation by improving the surface conditions. The adherent non wettable film built by FFA acts as a shield that limits the access of water and hydrated species to the metal or metal oxide surface. This barrier lowers the corrosion rate by inhibiting the mass transfer between surface and solution. The hydrocarbon chain imparts a hydrophobic character while the amine group bounds to the metal. Advantages of the FFA application for lay-up: Significant reduction of lay-up efforts; Long-term stability of the protective film even in aggressive environmental conditions; No influence on existing oxide layers; No negative influence on plant operation and performance; No environmental hazards of the waste water after system lay-up. Nevertheless application of film-forming amines are applied in fossil fired power plants, the requirement of nuclear power reactors are more ambitious. This paper deals with a possible layup application scenario in pressurized heavy water reactors. The proposed lay-up strategy will consider AREVA’s experience gathered with FFA non-continuous dosing in the whole secondary side of two PWRs during power operation with the target to reduce corrosion product transport into the steam generator.
Article Details
Section
Articles