The Stability Analysis of LAPUR6 for Chinshan BWR Nuclear Power Plant

Main Article Content

Jong-Rong Wang
Hao-Tzu Lin
Chang-Lung Hsieh
Chunkuan Shih

Abstract

Chinshan Nuclear Power Plant (NPP) is the first NPP in Taiwan which is a BWR/4 plant. The original rated power for each unit was 1775 MWt. After the project of measurement uncertainty recovery (MUR) for Chinshan NPP, the operating power is 1805 MWt now. The Chinshan NPP Unit 2 cycle 23 stability analyses were performed by the LAPUR6 stability analysis methodology. Comparing the LAPUR6 stability analysis results and vendor’s results, they are similar.

Article Details

Section
Articles