The Stability Analysis of LAPUR6 for Chinshan BWR Nuclear Power Plant
Main Article Content
Abstract
Chinshan Nuclear Power Plant (NPP) is the first NPP in Taiwan which is a BWR/4 plant. The original rated power for each unit was 1775 MWt. After the project of measurement uncertainty recovery (MUR) for Chinshan NPP, the operating power is 1805 MWt now. The Chinshan NPP Unit 2 cycle 23 stability analyses were performed by the LAPUR6 stability analysis methodology. Comparing the LAPUR6 stability analysis results and vendor’s results, they are similar.