Bruce Power New Fuel Project - Design Implementation of Bruce CANFLEX-LVRF

Main Article Content

M. Liska
D. McArthur

Abstract

Bruce Power has initiated a plan to refuel the four reactors at its Bruce B facility with low void reactivity fuel (LVRF), beginning in 2006. The L VRF will provide the necessary safety margins to allow the Bruce B reactors to operate at their design capacity to beyond 2015. The project, called "New Fuel Project" (NFP), includes the design of the fuel, out-reactor testing and a demonstration irradiation, and addresses system and process changes pertaining to the receipt, use, storage and management of fresh and used LVRF.

Article Details

Section
Articles