Manufacturing of 37-Element Fuel Bundles for PHWR 540 - New Approach

Main Article Content

U.K. Arora
V.S. Sastry
P.K. Banerjee
G.V.S.H. Rao
R.J. Jayaraj

Abstract

Nuclear Fuel Complex (NFC), established in early seventies, is a major industrial unit of Department of Atomic Energy. NFC is responsible for the supply of fuel bundles to all the 220 MWe PHWRs presently in operation. For supplying fuel bundles for the forthcoming 540 MWe PHWRs, NFC is dovetailing 37-element fuel bundle manufacturing facilities in the existing plants. In tune with the philosophy of self-reliance, emphasis is given to technology upgradation, higher customer satisfaction and application of modern quality control techniques. With the experience gained over the years in manufacturing 19-element fuel bundles, NFC has introduced resistance welding of appendages on fuel tubes prior to loading of U02 pellets, use of biodegradable cleaning agents, simple diagnostic tools for checking the equipment condition, on line monitoring of variables, built-in process control methods and total productive maintenance concepts in the new manufacturing facility. Simple material handling systems have been contemplated for handling of the fuel bundles. This paper highlights the flow-sheet adopted for the process, design features of critical equipment and the methodology for fabricating the 37-element fuel bundles, "RIGHT FIRST TIME".

Article Details

Section
Articles