Channel Coolant Flow Verification Support for the December 1995 Startup at the Point Lepreau Generating Station using NUCIRC MOD 1.911 and Pre-outage Channel Flow Models
Main Article Content
Abstract
This paper was not ready when these proceedings were being printed.
Article Details
Section
Articles