Romanian-Canadian Joint Program for Qualification of FCN as a CANDU Fuel Supplier
Main Article Content
Abstract
RENEL, the co-ordinator of Romanian Nuclear Program, have decided to improve, starting 1990 the existing capability to produce CANDU nuclear fuel at FCN Pitesti. The objective of the program was defined with AAC for the qualification of FCN fuel plant according to Canadian 2299.2 standard. The Qualification Program was performed under AAC Work Order C-003. The co-ordination was assumed by AECL, as overall Design Authority. ZPI were designated to supply technical assistance, equipments and know how where necessary. After a preliminary verification of the FCN fuel plant, including the processes and system investigation, performed under AECL and ZPI assistance, the Qualification Program was defined in all details. The upgrading of documentation on all aspects required by 2299.2 was performed. Few processes needed to be reconsidered and equipment was delivered by ZPI or other suppliers. This includes mainly welding equipments and special inspection equipments. Health Physics was practically fully reconsidered. New equipment and practice were adapted to provide adequate control on health conditions. Every manufacturing and inspection process was checked to determine their performance during a Qualification Run based on acceptance criteria which have been established in the Qualification Plan. Manufacturing Demonstration Run was an important step to prove that all plant functions have been accomplished during the fabrication of 200 fuel bundles. These bundles have been fully accepted and 66 of them have been loaded in the first charge of Unit 1 Cernavoda NPS. The surveillance and audit actions made by AECL and ZPI during this period confirmed the FCN capability to operate an adequate system meeting the to required quality assurance standard. The very open attitude of AECL, Zircatec and FCN staff have stimulated the progress of the project and a successful achievement of the target. The experience achieved during this project by all the parts involved ensures a good basis for the next joint programs.
Article Details
Section
Articles