Improving the Reliability of Stator Insulation System in Rotating Machines

Main Article Content

Bal K. Gupta
Howard G. Sedding
Ian M. Culbert

Abstract

Reliable performance of rotating machines, especially generators and primary heat transport pump motors, is critical to the efficient operation of nuclear stations. A significant number of premature machine failures have been attributed to the stator insulation problems. Ontario Hydro has attempted to assure the long term reliability of the insulation system in critical rotating machines through proper specifications and quality assurance tests for new machines and periodic on-line and off-line diagnostic tests on machines in service. The experience gained over the last twenty years is presented in this paper. Functional specifications have been developed for the insulation system in critical rotating machines based on engineering considerations and our past experience. These specifications include insulation stress, insulation resistance and polarization index, partial discharge levels, dissipation factor and tip up, AC and DC hipot tests. Voltage endurance tests are specified for groundwall insulation system of full size production coils and bars. For machines with multi-tum coils, tum insulation strength for fast fronted surges is specified and verified through tests on all coils in the factory and on samples of finished coils in the laboratory. Periodic on-line and off-line diagnostic tests are performed to assess the condition of the stator insulation system in machines in service. Partial discharges are measured on-line using several techniques to detect any excessive degradation of the insulation system in critical machines. Novel sensors have been developed and installed in several machines to facilitate measurements of partial discharges on operating machines. Several off-line tests are performed either to confirm the problems indicated by the on-line tests or to assess the insulation system in machines which can not be easily tested on-line. Experience with these tests, including their capabilities and limitations, are presented.

Article Details

Section
Articles