Flux Detector Replacement Coordination and Planning
Main Article Content
Abstract
This paper gives an overview of the planning effort to replace the twenty six vertical and seven horizontal flux detectors at Point Lepreau Generating Station during the 1992 annual outage. It discusses the strategy used for outage preparation, outage control, and how the flux detector replacement program was managed within the outage.
Article Details
Section
Articles